Factories Ingleburn The design and construction of three tilt-up factory units totalling 1500m2, with large mezzanine offices, car parking and loading docks.
UD Trucks Miranda The design and construction of a new warehouse facility including mezzanine office and covered hardstand. Pre-cast wall panels were used in this project to reduce on-site construction for minimum disruption for the client.
Camden Soil Mix The design and construction of two industrial buildings.
Stage 1 comprised of an offices and amenities building with adjoining truck and machinery service facilities.
Stage 2 involved the construction of a purpose built bagging and batching plant which required extensive consultation with the client and consultants.
1st Fleet truck wash The construction of a new truck wash facility within an existing transport depot, the work involved the installation of recycling facilities, cantilevered awning and structural alterations to the existing building.